We go beyond paving by offering consistent and superior service, sophisticated project management, and high-quality materials & workmanship to the local Atlanta market. Please browse our extensive solution offering:

Click Solution Title or Icon to Learn More.

Preventative Solutions

StreetPrint® Stamped Asphalt

streetprint
A newly patched or resurfaced pavement may benefit from a decorative or pattern paving option. Our Atlanta team is an accredited StreetPrint® installer. Commercial or residential entranceways, sidewalks, and pedestrian plazas can be imprinted with a traditional, popular, or custom pattern to help enhance curb appeal. Special equipment is used to heat the surface. Next, a stamping template is pressed into the pavement to replicate any design specified. Finally, the imprinted surface is coated for added protection. Ask your Rose Paving representative for details and pricing.

Infrared Asphalt Repair

infrared-atlanta

Infrared asphalt repair technology uses infrared light rays to heat an area of pavement, enabling quick removal of failed asphalt. This technology is ideal for critical repairs such as pavement depressions, trip hazards, potholes, and rough surfaces in drive lanes. New material is applied and compacted all with the same machinery. The procedure is faster than traditional removal and replacement, which means little disruption to you and your customers or tenants. It is a cost-effective and efficient option for retail or restaurant locations with little downtime as well as apartment communities and hospitals that require continuous access. For full technical specs, please click here.

Asphalt Patching and Repair

patching

As pavement ages, fine hairline cracks spread and deepen within the asphalt. Irritants such as water, oil, and UV rays enter through cracks and weaken the substrate. This may result in pavement heaving or isolated sections of alligator cracking. Fortunately, asphalt patching and repair can be performed throughout the year in Atlanta due to its mild climate. In fact, average winter temperatures do not fall below freezing. Therefore, when plants are open, hot-mix asphalt is the best solution to patch or repair damaged areas. For full technical specs, please click here.

Concrete Maintenance

maintenance

Freeze/thaw cycles, which occur most frequently in the months of January and February, wreak havoc on concrete pavement in the Atlanta area. Settling of poorly compacted fill also contributes to failure or instability. Removing and replacing damaged concrete is imperative to keep structures in top condition while also alleviating potential liabilities. Inspect concrete pavement routinely, but especially during the winter months, to catch defects early. Common procedures include repairing concrete sidewalks, stairs, curbs, gutters, dumpster pads, dock pads, parking bumpers, walls, ramps, and catch basins. For full technical specs, please click here.

Cracksealing

crack-sealing

Over time, due to wear and tear, all asphalt breaks down and cracks form. Usually, the first sign of deterioration is hairline or reflective cracks. Paying attention to cracks and applying sealant in a timely manner is the most beneficial service that can be performed on a parking lot because it slows the infiltration of water to the sub-base. Keep a close eye on open cracks, uneven transitions, and asphalt depressions; when cracks measure between ¼-inch and 1-inch wide, schedule cracksealing treatment. Once crackseal has been performed, follow up with sealcoat to help decelerate future cracking. For full technical specs, please click here.

Sealcoating

seal-coating

Atlanta has a UV index of 5.1, which is significantly higher than the U.S. average. With a high rate of exposure to the sun’s ultraviolet rays and its damaging effects, parking lots in the Atlanta area oxidize (or fade) much quicker than in other regions. Combat a gray, faded parking lot with routine sealcoating (we recommend every three years), which not only helps protect the pavement, it also provides a jet-black finish.

Rose Paving offers a true, two-coat application. This technique requires cure time in between application of the first and second coats. This curing is critical to the overall effectiveness of the procedure. A word of caution: humidity in Atlanta affects cure time; once final coat is applied, be sure to allow at least 24 hours before use of the parking lot.

Coal-tar or asphalt-based emulsions are available and material may be applied using a squeegee or spray method. Air and surface temperature must be 55 degrees and rising. For full technical specs, please click here.

Sport Surfaces

sports

Our Atlanta office is well experienced in maintaining tennis and basketball courts for HOA and apartment communities throughout the city and suburbs. Whether the surface requires crack sealing, re-striping, or resurfacing, our professionals can complete most projects within a week when weather conditions are favorable. Common defects include low-lying areas, which collect water, and create a bird-bath effect as well as surface cracking or heaving. But, resurfacing and re-striping are also necessary on a routine basis to keep your sport surfaces in good condition and to make a favorable impression on existing and potential tenants or residents. Ask your Rose Paving representative for details and pricing.

Catch Basin Repair

catch-basin

While Atlanta experiences its maximum average precipitation in July, excess rainfall could occur at any time. Under those conditions, catch basins work must work overtime to properly drain your parking lot. That is why we advise inspecting your catch basins regularly and especially after a good rainfall. Take note of standing water or other erosion such as raveling around the edges. These signs indicate it is time to repair surrounding pavement and adjust the basin height or replace the rings. Remember, if caught early, catch basin repairs can help prevent problem areas from spreading and weakening surrounding pavement. For full technical specs, please click here.

Lot Marking

lot-marking

Re-striping is a necessity for busy parking lots. Generally speaking, however, the procedure should occur every 3-5 years. Striping may be required more frequently if Atlanta experiences an icy winter and salt has been applied to the pavement. Striping paint reacts adversely to salt and breaks down more quickly as a result. In addition to re-striping, Rose Paving can also help with layout and design for a newly resurfaced parking lot. There are many options to review based on your lot size, traffic load, and ADA requirements. Striping and stenciling can be performed in a variety of colors and we can also assist with any signage needs. For full technical specs, please click here.

Structural Solutions

Catch Basin Installation

catch-basin-installation

Assess the number and location of catch basins on your parking lot. In many cases, slope is not achieved uniformly throughout a parking lot and lower spots may exist. Catch basins should be located in those areas to help water exit the surface. Catch basin installation begins by excavating the area as needed and installing a pre-cast concrete catch basin with necessary adjustment rings. Next, a cast-iron frame and lid is installed on the basin and set at the appropriate height for proper drainage. The excavated area is backfilled with crushed aggregate, leveled, and compacted. Finally, we recommend installing reinforced concrete around the perimeter for added strength. For full technical specs, please click here.

Concrete Parking Structures

structures

Although concrete is extremely durable and strong, it still requires ongoing maintenance and, after several years of performance, may require structural remedies to keep it stable and functional. Common repairs include reconstruction or expansion of a parking garage or deck, installation of concrete expansion joints, re-pour of walls and columns, cementitious or epoxy-based resurface over existing concrete floor, installation of a trench drain to improve storm-water flow, or replacing areas of asphalt with concrete. In fact, many commercial properties in Atlanta are replacing existing asphalt dumpster pads in exchange for a newly poured concrete pad. Concrete material is better suited in this area to withstand heavy loads and prevent pavement cracks from developing and spreading to adjacent areas. Learn more here.

Asphalt Reconstruction

reconstruction

Generally speaking, parking lots will require reconstruction around the 12-year mark. This time-frame may be longer or shorter based on the amount of routine preventative maintenance performed on the pavement. If maintenance has been deferred, however, or if the sub-base has deteriorated due to other site-specific factors, it becomes necessary to perform rehabilitation or reconstruct the pavement, whether in sections or in its entirety. Before reconstruction, identify and understand what is causing pavement failure. If water is a common problem, alternative under-drain solutions may be required. Additionally, to combat drainage problems, asphalt thickness may need to be increased. For full technical specifications, please click here.

Perma-Flex™ Resurfacing

permaflex

An option that may be included with asphalt resurfacing is the Perma-Flex™ overlay system. This protective, waterproof barrier is installed to help prevent any existing cracks from reflecting through the newly overlaid surface. However, effectiveness of Perma-Flex is dependent on the existing surface. Badly deteriorated areas must first be patched prior to installation and resurfacing. Once the surface is prepared, one inch of Perma-Flex and one-inch of asphalt topping will be installed for a combined two-inch structural lift. The result is a smooth and even finish for less than the cost of reconstruction. Ask your Rose Paving representative for details and pricing.

Asphalt Resurfacing

resurfacing

With ideal conditions and routine preventative maintenance, resurfacing in Atlanta is recommended between 7-10 years on commercial sites and between 5-7 years on industrial sites with heavy truck traffic. However, every parking lot is unique; therefore, it is best to perform routine inspections and take careful note of any grade depressions or widespread areas of cracking. If these defects are apparent, resurfacing is a long-term and cost-effective solution. For this procedure, air and surface temperature must be 45 degrees and rising. Standard resurfacing includes a 1.5-inch to 2-inch asphalt topping overlay. Material is feathered for a smooth transition to curb and gutter lines. For full technical specs, please click here.